Co-implement, then hand over
Discovery of requirements for Silver/Gold transformation, with ORG co-implementing Phase 1 and Phase 2 alongside Trainline internal IT.
- +Shared knowledge transfer: your team learns the lake, pipelines and patterns as they are built
- +Lower day-one dependency on ORG once the solution is live
- +Phase 1 architecture and Phase 2 transformation are designed together, so the lake is shaped by the same thinking
Cross-over experience in infrastructure and integration set-up. Full capacity through the first half, tapering as the build stabilises.
Integrations, Azure and hands-on build, with a strong finance background so they can talk directly to the finance team.
Strong finance experience, main link between SMEs and the build team. Writes SQL and Power BI for reporting streams.
Business subject matter experts. Heaviest at the start while requirements are shaped, lighter once decisions are locked.
Business testers. Awareness only at the start, then heavily involved from mid-project through go-live.
Only where the business wants a traditional scrum or waterfall cadence with formal reporting.
Roughly 60% of the total effort sits with ORG and 40% with Trainline, because your internal IT builds alongside us and your SMEs stay close to every design decision.